Drawing on our many years of experience as a laboratory testing sandwich panels and preparing test and classification reports covering the direct and extended application of test results, we see many questions and uncertainties surrounding the correct interpretation and practical use of the results obtained.

In this article, we discuss the application of EN 15254-5:2018 and EN 15254-5:2026, focusing on the differences in how the maximum permissible span of sandwich panels is determined. We hope this information will help sandwich panel manufacturers correctly determine and offer panel spans for their projects within the scope that can be substantiated by test results.

The examples below will help assess whether the range of solutions offered on the basis of EN 15254-5:2018 can be retained once EN 15254-5:2026 takes effect, or whether it will need to be reviewed and adapted to the new requirements.

In all the examples, the sandwich panels tested had a span of 3.0 m, and the test results established the following:

  • deflection not exceeding 100 mm,
  • the possibility of proportionally increasing the clearances that allow the wall to expand freely during heating [5].
  • a fire resistance period corresponding to simultaneous compliance with the integrity (E) and insulation (I) criteria.

The deflections stated in the examples are the maximum values measured during the test. The calculated maximum spans have been rounded down to whole centimetres to avoid overstating the calculated limit. This is the presentation method adopted here, rather than a universal requirement of the standard.

It was also assumed that direct application of the test result allows the span to be increased by 1 m, to 4 m.

Under EN 15254-5:2018, extending the span to 7.50 m required a time margin achieved in the test of at least 35% of the period associated with the target class, but no less than 10 minutes. The notation “max” in the calculations means selecting the greater of these two values. [3]

Under EN 15254-5:2026, the time margin is converted into additional metres using the rule applicable to the core type, panel orientation and — for horizontal PIR panels — the target class. The increase is calculated from the tested span, which is 3 m in the examples presented here.

If the calculations under EN 15254-5:2026 give a span of less than 4 m, the 4 m span permitted by direct application of the test result can be retained.

EXAMPLE 1

PIR sandwich panels, horizontal orientation, fire resistance test result of 41 minutes, maximum deflection of 80 mm.

EN 15254-5:2018

The calculated time required to adopt a maximum span of 7.50 m is:

tmin = 30 + max(0.35 × 30; 10) = 30 + 10.5 = 40.5 min

The test result of 41 min is greater than the calculated time, so a maximum panel span of up to 7.50 m can be adopted.

EN 15254-5:2026

For the panels tested in this example (with a span not exceeding 5 m), where the time achieved in the test does not exceed 45 min, a reduction of 6 min/m is applied.

Calculation of the maximum span:

LEXAP = 3 + 41 – 306 = 4.8333… m

For the panels tested, a fire resistance class of EI 30 and a maximum span of up to 4.83 m were obtained.

If the maximum panel span were to be 5 m, with a test time of 41 min, the time used to determine the fire resistance class would be: 41 − 6 × 2 = 29 minutes.

Thus, at a maximum span of 5 m, the fire resistance class is reduced from EI 30 to EI 20 and EI 15.

EXAMPLE 2

PIR sandwich panels, horizontal orientation, fire resistance test result of 82 minutes, maximum deflection of 95 mm.

EN 15254-5:2018

The highest fire resistance class in this case is EI 60. The minimum time required to extend the span to 7.50 m is:

tmin = 60 + max(0.35 × 60; 10) = 60 + 21 = 81 min

The test result of 82 min meets this requirement.

EN 15254-5:2026

Under this standard, EI 60 is a class above EI 45 minutes, so the maximum span was calculated using the following formula (the so-called 20 min/m rule):

LEXAP = 3 + 82 – 6020 = 4.10 m

The results obtained allow a fire resistance class of EI 60 and a panel span of up to 4.10 m to be declared.

Although the test result in EXAMPLE 2 was twice that in EXAMPLE 1, it should be noted that declaring a higher fire resistance class entails a reduction in the maximum panel span.

EXAMPLE 3

PIR sandwich panels, vertical orientation, fire resistance test result of 41 minutes, maximum deflection of 90 mm, fire resistance class EI 30.

EN 15254-5:2018

To allow the span of the sandwich panels in this arrangement to be increased to 7.50 m, the following condition must be met:

tmin = 30 + max(0.35 × 30; 10) = 30 + 10.5 = 40.5 min

The test result meets this requirement.

EN 15254-5:2026

For vertically oriented PIR sandwich panels, the 35 min/m rule must be applied:

LEXAP = 3 + 41 – 3035 = 3.3142… m

The result allows the panel span to be increased to 3.31 m. However, direct application of the test result can be used to increase the span to 4 m.

EXAMPLE 4

Mineral wool sandwich panels, horizontal orientation, fire resistance test result of 162 min, deflection of 70 mm, fire resistance class EI 120.

EN 15254-5:2018

To allow the span of the sandwich panels in this arrangement to be increased to 7.50 m, the following condition must be met:

tmin = 120 + max(0.35 × 120; 10) = 120 + 42 = 162 min

The calculated result exactly meets the threshold required by the standard.

EN 15254-5:2026

For the sandwich panel arrangement considered here, the 20 min/m rule applies within the span extension range under consideration, up to 6 m:

LEXAP = 3 + 162 – 12020 = 5.10 m

This allows the span to be increased to 5.10 m.

EXAMPLE 5

Mineral wool sandwich panels, vertical orientation, fire resistance test result of 81 min, deflection of 50 mm, fire resistance class EI 60.

EN 15254-5:2018

To allow the span of the sandwich panels in this arrangement to be increased to 7.50 m, the following condition must be met[3]:

tmin = 60 + max(0.35 × 60; 10) = 60 + 21 = 81 min

The test result meets the standard’s condition, so the panel span can be increased to 7.50 m.

EN 15254-5:2026

For this arrangement, the 35 min/m rule applies in accordance with the standard:

LEXAP = 3 + 81 – 6035 = 3.60 m

In this example, it is more favourable to use direct application of the test result, which allows the span to be increased to 4 m.

SUMMARY OF THE RESULTS FROM THE EXAMPLES

The table below summarises the results obtained in the examples.

Example no., core, tested orientation, test duration achieved

Class under EN 13501-2

Maximum span under EN 15254-5:2018

Maximum span under EN 15254-5:2026

Maximum span adopted in 2026

1. PIR, horizontal; 41 min

EI 30

7.50 m

4.83 m

4.83 m

2. PIR, horizontal; 82 min

EI 60

7.50 m

4.10 m

4.10 m

3. PIR, vertical; 41 min

EI 30

7.50 m

3.31 m

4.00 m, based on direct application of test results

4. Mineral wool, horizontal; 162 min

EI 120

7.50 m

5.10 m

5.10 m

5. Mineral wool, vertical; 81 min

EI 60

7.50 m

3.60 m

4.00 m, based on direct application of test results

Source: prepared on the basis of the cited documents.

Conclusions for sandwich panel manufacturers

In all five examples analysed, applying the new rules for determining the maximum span of sandwich panels reduces the permissible span for the highest EI fire resistance class achieved. This does not mean that the behaviour of the tested wall under fire conditions has changed; it limits the range of spans that can be substantiated by the test results obtained.

A properly prepared offer specifying the maximum panel span should take account of the fire resistance class, core type, installation direction and tested panel span together. The span achievable under the rules for direct and extended application of test results must also be verified. It should be remembered that, in addition to calculations carried out in accordance with the relevant standards, the panel fixing arrangement must be assessed, particularly the number and loadbearing capacity of the fasteners under fire conditions, as well as the loads arising from the panels’ self-weight.

In practical terms, manufacturers should first compare the spans required for current and planned projects with the scope that can be substantiated by their existing test results. Where discrepancies are identified, it may be necessary to restrict the declared field of application of the product or carry out additional tests planned specifically for the intended applications. This analysis is best carried out before making further commitments concerning the required EI fire resistance class and maximum panel spans.

All articles in the series

New rules for assessing the fire resistance of sandwich panels

1 of 5 — What changes for manufacturers

2 of 5 — The new rules in five examples — you are reading this article

3 of 5 — Facing colour and the scope of classification — in preparation

4 of 5 — Where the new requirements come from — in preparation

5 of 5 — Manufacturers’ frequently asked questions — in preparation

Glossary — explanations of abbreviations and terms

References

  1. EN 14509:2013. Self-supporting double skin metal faced insulating panels — Factory made products — Specifications. Edition consulted: PN-EN 14509:2013-12, English version; clauses 2, 5.2.4.2, C.2.2, C.2.4.1, E.3.3, ZA.1.1 and ZA.2.1.
  2. EN 13501-2:2023. Fire classification of construction products and building elements — Part 2: Classification using data from fire resistance and/or smoke control tests, excluding ventilation services. Edition consulted: PN-EN 13501-2:2023-09, English version; clauses 2, 6.3, 6.7, 7.1, 7.5 and Annex A.
  3. EN 15254-5:2018. Extended application of results from fire resistance tests — Non-loadbearing walls — Part 5: Metal sandwich panel construction. Edition consulted: PN-EN 15254-5:2018-06, English version; clauses 3, 4, 5.2.2.1, 5.2.4.2, 5.3.1, Table 4 and Annex B.
  4. EN 15254-5:2026. Extended application of results from fire resistance tests — Non-loadbearing walls — Part 5: Metal sandwich panel construction. Edition consulted: BS EN 15254-5:2026; Foreword, clauses 3, 5.2.2.1, 5.2.3, 5.2.4.2, 5.3.1, 5.4, Tables 4 and 5, and Annex B.
  5. EN 1364-1:2015. Fire resistance tests for non-loadbearing elements — Part 1: Walls. Edition consulted: PN-EN 1364-1:2015-08, English version; clause 13.3 and Annex B, clause B.6.3.

New rules for assessing the fire resistance of sandwich panels – what do they mean for manufacturers?

Czytaj po polsku

EN 15254-5:2026 rules and the use of existing test results

Article 1 of 5 • Series overview • Glossary

This is the first of five articles on the new rules for assessing the fire resistance of sandwich panels. We will publish the subsequent parts at regular intervals. In this article, we discuss how the new EXAP rules affect allowable panel spans.

What the EI class of a sandwich panel wall means

A sandwich panel consists of two metal facings and an insulating core, for example polyisocyanurate (PIR) foam or mineral wool.

The letter E denotes integrity: the ability of a separating element to prevent the passage of flames and hot gases that could ignite materials on the other side of the wall. The letter I denotes insulation: limiting the temperature rise on the side away from the fire. EI 30 means that both criteria are met for at least 30 minutes. [2]

A fire resistance test result of 41 minutes allows, at most, an EI 30 classification, as it falls four minutes short of EI 45. Similarly, a test result of 82 minutes may provide the basis for an EI 60 classification. [2]

In accordance with EN 14509:2013, the fire resistance assessment rules described below apply only to non-loadbearing walls made of factory-made sandwich panels with two metal facings. These rules therefore cannot automatically be applied to roofs, ceilings or loadbearing walls. [1, 4, 5]

EN 1364-1 covers testing, including the testing of a sandwich panel wall with specified dimensions and construction, while EN 13501-2 sets out the rules for assigning a fire resistance class to that wall.

A manufacturer usually offers many wall variants. Rules are therefore needed, among other things, to determine the permitted changes to panel dimensions and construction on the basis of the test result for a single tested configuration. [1, 2, 5]

The field of direct application of test results allows the span to be increased by 1 m for a tested wall with a span of at least 3 m and a deflection not exceeding 100 mm, together with a proportional increase in the clearances that allow the wall to expand during heating. [5]

A further way of extending wall fire resistance test results is through classification based on the extended application of test results in accordance with EN 15254-5.

The same fire resistance test result and the rules for extending the field of application under EN 15254-5:2018 and EN 15254-5:2026

Consider a wall made of PIR-core sandwich panels spanning horizontally between supports 3 m apart. Assume that the fire resistance test result was 41 minutes without loss of integrity or insulation. For EI 30, this therefore leaves an 11-minute margin above the required classification period. [3, 4]

EN 15254-5:2018

Increasing the span from 3 to 6 m required a margin of at least 20% of the period associated with the relevant class, but no less than 10 minutes. Extension to 7.50 m required at least 35%, again with a minimum of 10 minutes. [3]

For EI 30, the first threshold was 40 minutes: 20% of 30 minutes is 6 minutes, so the minimum 10-minute margin governed. The second threshold was 40.5 minutes, because 35% of 30 minutes is 10.5 minutes. A result of 41 minutes met both thresholds and, subject to the other requirements being met, allowed the EI 30 classification to cover spans of up to 7.50 m. [3]

EN 15254-5:2026

Wall spans are calculated using the formula below: [4]

LEXAP = L0 + t0 – Tk

L₀ denotes the span of the tested wall (not less than 3 m), m

t₀ — the test duration achieved, min

T — the period required for the target class, min

k — the time reduction per metre, min/m.

Example:

For horizontal PIR panels and the EI 30 class considered here, the result is reduced by 6 minutes for each additional metre of span. The 11-minute margin corresponds to an increase of approximately 1.83 m. The calculation starts from the tested span of 3 m: [4]

LEXAP = 3 + 41 – 306 = 4.8333… m

The result, rounded down to whole centimetres, is EI 30 for a span of up to 4.8 m. Rounding down is the presentation method adopted in this article, rather than a universal requirement of the standard. At 5 m, 29 minutes would remain, because 41 − 6 × 2 = 29. This is sufficient for EI 20, but not for EI 30. [4]

The 6 min/m rule applies to spans no greater than 5 m. A greater span requires an appropriate separate basis for assessment provided for in the standards. [4, 5]

The 6 min/m rule is not a general rule. The standards use different wall span calculations depending on the core type and panel orientation, and, for horizontal PIR panels, also on the required classification period.

Rules for increasing spans based on results from tests on walls with a span of at least 3 m

Core and orientation

Fire resistance class

Span range

Time reduction

PIR, horizontal

Up to and including EI 45 min

3–5 m

6 min/m

PIR, horizontal

Above EI 45 min

3–6 m

20 min/m

PIR, horizontal

Above EI 45 min

6–8 m

35 min/m

PIR, vertical

All classes

3–8 m

35 min/m

Mineral wool, horizontal

All classes

3–6 m

20 min/m;

Mineral wool, horizontal

All classes

6–8 m

35 min/m

Mineral wool, vertical

All classes

3–8 m

35 min/m

Source: prepared on the basis of the cited documents. [4]

Choosing between direct application and extended application of test results

If direct application of the test result allows the span to be increased from 3 m to 4 m, the permitted span will be 4 m even if the span calculated using the extended application rules is less than 4 m.

Increasing the span always requires an increase in the number of fixings. [4]

Conclusions

EN 15254-5:2026 changes the way the field of application is determined from existing test results. In the example discussed, this change limits the span for EI 30 from 7.5 to 4.8 m. This does not mean that the performance of the wall already tested has deteriorated; it changes the limits within which that result can be extended.

Manufacturers should compare the parameters required for their product range with the field of application that can be substantiated under the new standard. The assessment must cover the core type, panel orientation, class, span and installation conditions. If existing results are insufficient to retain the intended field of application, it will need to be restricted or additional testing will need to be planned.

Article series overview

New rules for assessing the fire resistance of sandwich panels

Further parts of the series will be published in sequence. Their topics are listed below; links to the articles will be added once they have been published.

1 of 5 — What changes for manufacturers — you are reading this article

2 of 5 — The new rules in five examples

3 of 5 — Facing colour and the scope of classification — in preparation

4 of 5 — Where the new requirements come from — in preparation

5 of 5 — Manufacturers’ frequently asked questions — in preparation

Glossary — explanations of abbreviations and terms

References

[1] EN 14509:2013. Self-supporting double skin metal faced insulating panels — Factory made products — Specifications. Edition consulted: PN-EN 14509:2013-12, English version; clauses 2, 5.2.4.2, C.2.2, C.2.4.1, E.3.3, ZA.1.1 and ZA.2.1.

[2] EN 13501-2:2023. Fire classification of construction products and building elements — Part 2: Classification using data from fire resistance and/or smoke control tests, excluding ventilation services. Edition consulted: PN-EN 13501-2:2023-09, English version; clauses 2, 6.3, 6.7, 7.1, 7.5 and Annex A.

[3] EN 15254-5:2018. Extended application of results from fire resistance tests — Non-loadbearing walls — Part 5: Metal sandwich panel construction. Edition consulted: PN-EN 15254-5:2018-06, English version; clauses 3, 4, 5.2.2.1, 5.2.4.2, 5.3.1, Table 4 and Annex B.

[4] EN 15254-5:2026. Extended application of results from fire resistance tests — Non-loadbearing walls — Part 5: Metal sandwich panel construction. Edition consulted: BS EN 15254-5:2026; Foreword, clauses 3, 5.2.2.1, 5.2.3, 5.2.4.2, 5.3.1, 5.4, Tables 4 and 5, and Annex B.

[5] EN 1364-1:2015. Fire resistance tests for non-loadbearing elements — Part 1: Walls. Edition consulted: PN-EN 1364-1:2015-08, English version; clause 13.3 and Annex B, clause B.6.3.

“Sampling” in fire testing of construction products

Introduction

Sampling is a key step in the process of assessing and verifying the constancy of performance of construction products undergoing testing. It provides detailed information about the tested structure, its material composition, and key design features, which allows for the proper interpretation of test results in relation to the product intended for market introduction. The primary goal of sampling is to confirm that the tested product is identical to the product that will be marketed, while also ensuring that the sample taken faithfully represents the final product.

In the case of products with fire properties, proper sampling is particularly important as it has a direct impact on the level of fire safety.

Legal requirements and market practice

In accordance with Regulation (EU) No 305/2011 of the European Parliament and of the Council , laying down harmonised conditions for the marketing of construction products (concerning CE marking), and the Regulation of the Minister of Infrastructure and Construction of 17 November 2016 on the method of declaring the performance of construction products and the method of marking these products with the construction mark, the obligation to perform sampling in the AVCP 1 and 1+ systems is clearly defined.

Despite this, for many years this process was often overlooked, primarily due to established market practices and limited awareness of the importance of sampling in assessing the performance of construction products. An additional barrier was posed by complex procedures that required advanced technical skills and were time-consuming. As a result, sampling was not given the attention it deserved, despite its crucial role in ensuring the reliability of test results and product compliance with legal requirements.

Increased awareness and new requirements

In recent years, many notified bodies have begun to place greater emphasis on proper sampling, introducing stringent requirements for this process. According to the guidance contained in document NB-CPR/15/639r3 , issued by the Coordination Group of Notified Bodies (GNB-CPR), regarding sampling in AVCP 1 and 1+ systems, sampling is a key element in assessing and verifying the constancy of performance of construction products. Failure to properly conduct sampling increasingly often results in refusals to perform laboratory tests and issue test reports.

It is worth noting that the sampling provisions apply not only to products covered by the CE marking, but also to construction products marked with a national construction mark. 

Sampling methods

The choice of sampling method depends on the product type and production stage. The most commonly used include:

· Sampling directly from production – allows you to monitor the process in real time and provides certainty as to the origin of the samples.

· Sampling from the manufacturer’s warehouse – random selection from finished products, especially useful after production.

Sampling of custom products (“made to order”) – in the case of custom production, samples are prepared specifically for testing, usually in the most difficult variant (“worst case”).

· Prototype sampling – used when the product is in the development stage.

Each of these methods should be carefully documented, indicating the sampling location, labeling method and information about the origin of the samples.

Challenges of Sampling for Fire Tests

Due to their complex design, large size, and high manufacturing costs, fire-resistant products present a particular challenge when it comes to sampling. A prototype is typically used, as the manufacturer typically prepares only one unit for fire testing. If test results prove negative, design modifications are implemented and testing repeated to achieve the required level of safety. In such cases, sampling must always be conducted with the utmost care to ensure the sample faithfully reflects the design of the target product. This is especially important in fire testing, where the sample is completely destroyed, making subsequent analysis impossible.

Documentation and reporting

Each sampling step requires thorough documentation. The report should include design details, manufacturer information, the number of samples taken, the date and location of sampling, and labeling. This transparency guarantees the credibility of the entire process. The sampling report is then referenced in the fire test report, facilitating the replication of the tested solutions and confirming their consistency with the product being marketed.

Summary

In recent years, there has been a significant shift in the approach to sampling in the conformity assessment process for construction products. Awareness of the importance of this step has grown, and notified bodies across Europe have begun to place greater emphasis on proper sampling, viewing it as an essential element in assessing and verifying the constancy of performance of products.

Proper sampling is not only a formal obligation arising from legal regulations, but above all, a crucial element in ensuring the safety of end users. It is precisely through carefully conducted sampling that it is possible to obtain reliable test results that reflect the actual properties of the product being introduced to the market.