16-11-2026
New rules for assessing the fire resistance of sandwich panels – where do the new requirements come from?
Czytaj po polsku | English
Classifications and manufacturers’ documentation following the revision of EN 15254-5
Article 3 of 5 · Article series · Glossary
The new EXAP standard, EN 15254-5:2026, changes the rules for determining the field of application of sandwich panel walls. For manufacturers, this means checking whether the documents supporting their declared fire resistance still justify the solutions they offer. We explain how testing, EXAP and classification relate to the declaration of performance and CE marking, and why a revision of the standard should not be equated with all previous tests automatically becoming invalid.
The route discussed here applies to non-loadbearing walls made of factory-made, double skin metal faced sandwich panels covered by EN 14509:2013. The rules for this application should not automatically be applied to roofs, ceilings or loadbearing walls. [1, 3]
From the test result to the declared EI class
Fire resistance describes the ability of a particular construction to maintain its required functions during a fire. In the EI designation, E stands for integrity and I for insulation. The number indicates the classification period in minutes. EI 30 therefore means that both criteria are met for at least 30 minutes, under the conditions and within the scope described in the documentation. [1, 2]
A test report records the performance of a particular specimen: its construction, installation and test results. An extended application report, or EXAP report, uses the rules in the relevant standard to establish permitted variations from the tested construction. EN 13501-2:2023 defines the fire resistance classes. These documents serve different purposes, but together they provide the basis for declaring the performance of the product offered. [1, 2, 3]
The manufacturer’s responsibility for the DoP and CE marking
The declaration of performance, or DoP, links the confirmed performance to a specific product-type and its intended use. For the sandwich panels discussed here, the rules for assessment and declaration are set out in the harmonised standard EN 14509:2013, whose reference has been published in the Official Journal of the European Union. [1, 4, 5]
By drawing up the DoP, the manufacturer assumes responsibility for the conformity of the products supplied with their declared performance. By affixing the CE marking, the manufacturer also assumes responsibility for compliance with the applicable requirements. However, CE marking alone does not mean that a panel is suitable for every construction. Designers and contractors must check whether the confirmed class, span, direction of fire exposure and installation conditions match the specific application. [1, 2, 4]
Checking the documentation should therefore go beyond reading the EI designation. If a classification permits a particular support spacing or fixing arrangement, offering a wider scope requires an appropriate supporting basis. The product name, commercial information and declared performance must all refer to the same technical solution. [1, 2, 4]
The roles of the manufacturer and laboratory under AVCP system 3
Responsibilities are allocated through the systems for assessment and verification of constancy of performance, abbreviated to AVCP. System 3 applies to the fire resistance of the walls discussed here. The manufacturer carries out factory production control, ensures that samples are representative and taken appropriately, maintains the documentation, draws up the DoP and affixes the CE marking. A notified laboratory assesses the performance within the relevant scope. [1, 4, 8]
Factory production control means the ongoing, documented checking of raw materials and the production process to ensure that the finished product meets its declared performance. System 3 does not require a certificate of constancy of performance or surveillance of factory production control by a notified body. Oversight of factory production control is the manufacturer’s responsibility. For fire resistance, the assessment is based on testing and classification, together with EXAP where a scope beyond the direct field of application of the test results is needed. [1, 4, 8]
When choosing a laboratory, check that its scope of notification covers the relevant tasks. Notification concerns authorisation to carry out specific tasks within the European construction products assessment system. Accreditation confirms a laboratory’s competence to perform particular tasks in accordance with the applicable technical specification requirements, but it is not the same as notification. The terms should not be used interchangeably. [4, 8]
Why a reaction-to-fire certificate does not replace a fire resistance assessment
Reaction to fire describes a product’s contribution to the development of a fire. Fire resistance concerns the ability of a construction to maintain its functions over time. For a single panel, these two characteristics may be subject to different AVCP systems. A certificate of constancy of performance for reaction to fire under system 1 therefore does not automatically confirm fire resistance assessed under system 3. [1, 4, 7, 8]
AVCP systems for the fire characteristics of sandwich panels under the EN 14509 route discussed here
| Characteristic and class | System | Condition for application |
|---|---|---|
| Fire resistance — all classes | 3 | The wall application assessed under EN 14509 and discussed in this article. |
| Reaction to fire — A1, A2, B, C | 1 | An identifiable production stage improves the reaction-to-fire classification. |
| Reaction to fire — A1, A2, B, C | 3 | The condition in ZA.2.1 has been demonstrated: the criterion for system 1 does not apply. |
| Reaction to fire — D, E | 3 | Assessment using the appropriate methods, except where a permitted route without testing applies. |
| Reaction to fire — A1–E | 4 | An appropriate basis for classification without testing exists and all its conditions are met. |
| Reaction to fire — F | 4 | The case provided for in Table ZA.2; class F does not mean NPD. |
Source: compiled from the documents cited. [1, 7]
Manufacturers cannot freely choose between system 1 and system 3 for reaction to fire. EN 14509 assumes that the condition for system 1 relating to a production stage that improves this characteristic applies, unless it is demonstrated to the notified body that no such stage exists. Such a production stage may involve adding fire retardants or limiting the organic material content. NPD, by contrast, means No Performance Determined. [1, 4, 7]
Is a separate document entitled ‘Assessment of Performance’ required?
An assessment of performance, often abbreviated to OWU in Polish, must be carried out, but it does not always require an additional document bearing that title. The guidance paper NB-CPR/23-936r3, issued by the Group of Notified Bodies, indicates that the assessment results may be documented in an appropriate classification report, together with EXAP where needed, or in another suitable report. What matters is the completeness and scope of the assessment, rather than the number of documents. This guidance paper is neither legislation nor an independent EXAP method. [9]
What needs to happen to earlier EXAP reports and classifications?
The references to EN 15254-5 in EN 14509 and EN 13501-2 are undated: they do not specify a year of publication. This means that the latest edition of the standard, including amendments, applies. [1, 2, 3]
A classification report based on EN 15254-5:2018 needs to be updated to reflect the new rules. This does not mean that every earlier document becomes invalid. Test data may still be used in the assessment, provided they meet the conditions for use under the new edition. The main documents requiring an update are the assessment of the EXAP scope prepared under the previous rules and the classification based on it, which supports the declaration of performance. [1, 2, 3]
EN 15254-5:2026 was approved by CEN on 15 June 2026, and national editions began appearing in July. The foreword specifies January 2027 as the latest date for national implementation and withdrawal of conflicting national standards. [3]
The new CPR does not freeze the previous EXAP rules
Regulation (EU) 2024/3110 generally applies from 8 January 2026, but includes transitional provisions. Articles 94 and 95 retain the relevant provisions of CPR 305/2011 for products covered by existing harmonised standards until those standards are withdrawn by the Commission or the relevant provisions otherwise cease to apply, subject to the final deadline of 8 January 2040. This applies to the EN 14509:2013 route discussed here. [4, 6]
The publication of a new EXAP standard does not, by itself, move sandwich panels into the new declaration system. It does, however, change the technical basis for establishing the field of application. The manufacturer remains responsible for maintaining reliable documentation: Article 11 of CPR 305/2011 requires changes to the product-type and the applicable harmonised technical specifications to be taken into account. The transitional provisions of the new CPR do not justify disregarding the current rules of the standards referenced in that technical basis. [1, 2, 4, 6]
Practical conclusions
Manufacturers should compare the EI classes, spans and panel variants they offer with the scope that can be substantiated under EN 15254-5:2026. The relevant EXAP reports and classifications should then be updated, ensuring consistency between declarations, technical documentation and commercial information. Simply comparing an earlier assessment with the new standard is not a substitute for updating the documents. [1, 2, 3, 4]
If the existing results support the scope required, they may be used to prepare updated documentation. If they are insufficient, the manufacturer faces a choice: narrow the product offering or carry out additional tests planned around market requirements. It is worth completing this assessment before making commitments for solutions whose current supporting evidence remains uncertain.
All articles in the series
New rules for assessing the fire resistance of sandwich panels
- 1 of 5 — What changes for manufacturers
- 2 of 5 — The new rules in five examples
- 3 of 5 — Where the new requirements come from — you are here
- 4 of 5 — Facing colour and the scope of classification — in preparation
- 5 of 5 — Manufacturers’ frequently asked questions — in preparation
Glossary — abbreviations and terminology explained
Sources
- EN 14509:2013. Self-supporting double skin metal faced insulating panels — Factory made products — Specifications. Clauses 2, 5.2.4.2, C.2.2, C.2.4.1, ZA.1.1 and ZA.2.1.
- EN 13501-2:2023. Fire classification of construction products and building elements — Part 2. Clauses 2, 6.3, 6.7, 7.1 and 7.5, and Annex A.
- EN 15254-5:2026. Extended application of results from fire resistance tests — Non-loadbearing walls — Part 5: Metal sandwich panel construction. Foreword and extended application rules.
- Regulation (EU) No 305/2011 of 9 March 2011 laying down harmonised conditions for the marketing of construction products, as amended. Articles 4, 8 and 11, and Annex V, point 1.4, taking account of the transitional provisions of Regulation (EU) 2024/3110. EUR-Lex
- Commission communication 2018/C 092/06. Official Journal of the European Union C 92, 9 March 2018, p. 139 onwards; entry for EN 14509:2013. EUR-Lex
- Regulation (EU) 2024/3110 of 27 November 2024 laying down harmonised rules for the marketing of construction products. Articles 94–96, in particular Article 95(3), (8) and (9). EUR-Lex
- Commission Decisions 98/436/EC and 98/437/EC, as amended by Decision 2001/596/EC. Annexes III; allocation of systems for reaction to fire and fire resistance, referenced in EN 14509, ZA.2.1. 98/436/EC • 98/437/EC • 2001/596/EC
- Commission Delegated Regulation (EU) No 568/2014 amending Annex V to Regulation (EU) No 305/2011. Source of the wording of the AVCP systems used under the transitional regime. EUR-Lex
- GNB-CPR. NB-CPR/23-936r3, Reporting the results of Assessments of Performance in AVCP system 3, 23 August 2024, points 1, 2(2) and 3(j). Guidance paper.